<video id="djrbi"><input id="djrbi"></input></video>
    1. <wbr id="djrbi"><object id="djrbi"></object></wbr>

      1. <i id="djrbi"><bdo id="djrbi"></bdo></i>

          <u id="djrbi"><thead id="djrbi"></thead></u>
          會員登錄
          請登錄您的生意號,獲取電子名片。便于轉發分享!
          取消
          Tianda News
          會員登錄
          請登錄您的生意號,獲取電子名片。便于轉發分享!
          取消
          Plasterboard production heating system supporting
          Release Time:2021-11-17
          Plasterboard production heating system supporting

          Technology introduction

          As light, environmental building materials, gypsum board is more and more welcome by the market. In particular, the utilization of desulphurized gypsum, phosphogypsum and other industrial wastes into treasure has significant economic and social benefits. Most of the gypsum board lines in early China are used in heat transfer oil heat transfer process, due to the existence of high energy consumption, oil needs to be replaced regularly, maintenance cycle is short, low open probability defects. In recent years, some big manufacturers have adopted gas-gas heat exchange heating system, and achieved good results.

          Technical features

          1.Because of the use of fluidized bed combustion technology, and reasonable waste heat recovery process, its comprehensive thermal efficiency is up to 80%;
          2.Wide combustion adaptability, burning rate of more than 99%;
          3.Simple process, continuous automatic production, using the new bag dust collector, up to environmental protection standards;
          4.High degree of automation, hot blast stove part only need to be equipped with 2-3 people can maintain production;
          5.Long equipment maintenance cycle, less production supplies, high opening rate, low production cost.

          Performance and parameters

          Technical parameters 10 million m2 production line 20 million m2 production line 30 million m2 production line 50 million m2 production line
          Model of hot blast stove ZDKR600 ZDKR1200 ZDKR1600 ZDKR2600
          coal consumption (standard coal) 1116kg/h 2232kg/h 2976kg/h 4836kg/h
          total installed capacity 165kw 278w 369kw 524kw
          combined thermal efficiency >80% >80% >80% >80%
          production staffing 2 people/group 2 people/group 2 people/group 2 people/group

           

           

           

          Home

          Home

          News

          News

          About

          About

          Products

          Products

          Contact

          Contact

          久久无码免费视频_中文字幕av王_人妻无码AⅤ在线_久久久久中文无码